ITER Control

ITER Control

 

Jmp ingenieros develop the design of complex software for the plasma diagnostics and electronic control of the world’s first fusion reactor (ITER). The goal of the project is to control 2.400 variables involved in the control of the fusion nuclear reactor with a control loop rate of 500.000 times per second.

The consortium of this project is composed of four companies with experience in the energy sector:

  • Jmp ingenieros
  • GTD Sistemas de Información de Barcelona
  • Fusion for Energy. Authority in Atomic Energy of the United Kingdom.
  • Culham Center for Fusion Energy. National Laboratory of the United Kingdom at the Culham Institute in Oxford.

 

Date

17 July 2018

Tags

Energy

Quick links

Contact us

At Jmp we are interested in your opinion, projects or initiatives and we want to have a flued communication with each client..

"If you wait for the right moment, you will never stop waiting." (Jasmine Gillman)

correo@jmpingenieros.es
©2019 Jmp ingenieros S.L. All right reserved